PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

3rd floor interior electrical roughing Facing East.jpg Column Line E-1 2nd Floor.jpg Installed VAV boxes at the 2nd floor.jpg Installing metal framing at the 3rd floor Facing North-East.jpg VAV Boxes 1.jpg VAV Boxes 2`.jpg VAV Boxes 3.jpg 045 (800x600).jpg 3rd floor sprinkler main raiser Facing North-East.jpg
Previous pageNext page VAV Boxes 1
VAV Boxes 1